The UltraSense monitor has been developed to a point where it has been successfully commissioned for trial within hours of delivery to the factory. Essential requirements to achieve this are: a detailed survey of the line including clearances and accurate measurements of line height for each cable size and good planning.
UltraSense installation requirements.
VPN:
A key element in the speed with which we can commission UltraSense on a new line is a remote VPN link either over the factory network or via dial-up through the phone lines. This enables the engineers at IPEC to supervise the calibration of the cables and where necessary to optimize the setup remotely. This has a two-fold benefit of achieving early success with the equipment and enabling remote training of factory staff.